Description
System solutions with a perspective
Please note the minimum lead time for this product is 2 weeks.
TPFEFC-BOX
This gives you an efficient and reliable chimney draught solution. It also provides the basis for an optimal solution – both during design and planning.
The system is a reliable and simple solution to meet the requirements and standards within the various areas of use.