Description
System solutions with a perspective
Please note the minimum lead time for this product is 2 weeks.
TPFEBC24 – For multiple boiler systems with single-stage, two-stage, and modulating burner. Automatic disconnection of boiler in case of insufficient draught. Possibility of adjustable pre-run and post-run, manual reset and pressostat check. TPFEBC24EU01 for indoor mounting. TPFEBC24EU02 for outdoor mounting